Cricket Score Cards

Shanthan Chamala

Department Of Computing Sciences

Villanova University
Independent Study Project
Advisor : Dr. Tom Way

 

 

 


Description:

As part of my Independent study, I would like to explore MVC Architecture, part of J2EE Architecture. Besides exploring, I would like to implement a small project. I am planning to develop a Web Application for Villanova Cricket Club, which can store and retrieve their match results. This project has a front end where a user can choose to retrieve the stored information (Score cards) and can create new Score cards (Storing information). A database is used to store the information. MVC (Model, View, Controller) architecture will be used for implementing this Project.

Project Schedule:

               DATE

                                             Description Status
               JULY Meet with Advisor, Discussed about the Topic, Registered for Independent study Completed
               09/17 Discussed about the topic with Professor via Email Completed
               09/18 Meeting with Prof. Way and finalized the Topic Completed
               09/21 Uploaded the Project description. Completed
               09/29 Create the Project web Page and emailed the same to Professor. Completed
               10/10 Review of the project Description Completed
               10/20              Requirements Collection Completed
               10/25 Complete Exploring the MVC Architecture Completed
               11/02 Complete the Introduction and email the rough copy to Professor Completed
               11/08 Requirements Collection and Basic Design Completed
               11/15 Complete the Rough copy notes of the MVC Architecture and Design Phase. Completed
               11/19 Submit the second Draft to the Professor Completed
               11/20 Complete the JDBC Connectivity (Front end with Oracle Database). Completed
               11/25 Complete all the tables required for the Project. Completed
               11/30 Complete the Front end required for the Project. Completed
               12/05 Submit Draft #4 to the Professor for evaluation. Completed
               12/08 Meeting with Prof. Way for Project Demonstration Completed
               12/12 Submit the Final Report to the Professor Completed

 

Home

Last Updated on December 12, 2008